Road construction works for Route Départementale n° 925 between Dieppe and Saint-Martin-en-Campagne
Road construction works for Route Départementale n° 925: Divided into two technical tranches. Tranche 1 includes the upgrade of RD 925 to 2x2 lanes between Dieppe and Saint-Martin-en-Campagne (Petit Caux), with an execution period of 18 months. Tranche 2 involves the construction of a roundabout for access to the Eurochannel III Zone in Petit Caux and Martin Église, with an execution period of 4 months. In case of overlapping tranches, the maximum overall execution period is 18 months. A preparation period of 90 days from contract notification is planned and not included in the execution time.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 592433-2026HTML
- TED PDF — 592433-2026PDF
- TED XML — 592433-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.