Road construction for the relocation of Road I/45, Stage I
Road construction for Stage I of the relocation of Road I/45: approx. 5.0 km of a Class I road in category S 11.5/90 between Nové Heřminovy and Zátor, necessitated by flood protection measures and the Nové Heřminovy Waterworks. Construction of one roundabout in Nové Heřminovy (connecting Road III/4581 and local roads), one at-grade intersection with Road III/4583, one roundabout in Loučky u Zátoru (connecting existing Road I/45 and local roads), and one roundabout in Zátor (connecting Roads III/4585 and III/45910 as well as local roads). Several bridge structures, retaining walls in deep cuts, retaining walls along the right-bank service road, noise protection measures in residential areas, and modifications and connections of lower-class roads affected by the construction. Works are to be performed according to the project documentation by “Morava – RD PP pro střední zakázky BIM 2020”.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 607320-2026HTML
- TED PDF — 607320-2026PDF
- TED XML — 607320-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.