Road construction for the relocation of Road I/45, Stage I
Road construction for Stage I of the relocation of Road I/45: Construction of an approximately 5.0 km long, Class I road in category S 11.5/90 between Nové Heřminovy and Zátor. The relocation is necessary due to flood protection measures on the Horní Opava and the Nové Heřminovy Waterworks, as the existing road will be located in the flood zone. The scope includes one roundabout in Nové Heřminovy (connecting Road III/4581 and local roads), one at-grade intersection with Road III/4583, one roundabout in Loučky u Zátoru (connecting the existing Road I/45 and local roads), and one roundabout in Zátor (connecting Roads III/4585 and III/45910 as well as local roads). Furthermore, several bridge structures, retaining walls in deep cuts and along the right-bank service road, and noise protection measures in residential areas will be built. Adjustments and connections of lower-class roads affected by the construction are also part of the scope. The work will be carried out according to the project documentation by “Morava – RD PP pro střední zakázky BIM 2020”.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 543194-2026HTML
- TED PDF — 543194-2026PDF
- TED XML — 543194-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.