Road construction for the relocation of Road I/45, 1st stage
Road construction for the 1st stage of the relocation of Road I/45: Construction of a Class I road with a length of approx. 5.0 km in category S 11.5/90, connected at both ends to the existing Road I/45. The relocation between Nové Heřminovy and Zátor is a necessary investment due to flood protection measures on the Upper Opava and the Nové Heřminovy Waterworks, as the existing road will be interrupted and located in the flood zone. Road I/45 must be moved above the flood level of the Nové Heřminovy reservoir. The works include a roundabout in Nové Heřminovy (connecting Road III/4581 towards Milotice and local roads), a level crossing with Road III/4583 (towards Čaková), a roundabout in Loučky u Zátoru (connecting the existing Road I/45 and local roads), and a roundabout in Zátor (connecting Road III/4585 towards Brantice or III/45910 towards Lichnov and local roads). Furthermore, several bridge structures, retaining walls in deep cuts and along the right-bank service road, and noise protection measures in residential areas will be built. Adjustments and connections of lower-class roads affected by the construction are also included. The execution will be according to the project documentation prepared by the consortium "Morava – RD PP pro střední zakázky BIM 2020", leading partner SHB a.s.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 554363-2026HTML
- TED PDF — 554363-2026PDF
- TED XML — 554363-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.