Road construction for the relocation of Road I/45, 1st stage
Road construction for the 1st stage of the relocation of Road I/45: construction of an approximately 5.0 km long road of category S 11.5/90 between Nové Heřminovy and Zátor, connected at both ends to the existing Road I/45. The relocation is necessary due to flood protection measures on the Horní Opava and the Nové Heřminovy waterworks, as the existing road will be located in the flood zone. The works include a roundabout in Nové Heřminovy (connecting Road III/4581 and local roads), an at-grade intersection with Road III/4583, a roundabout in Loučky u Zátoru (connecting existing Road I/45 and a local road), and a roundabout in Zátor (connecting Road III/4585 or III/45910 and local roads). Furthermore, several bridge structures, retaining walls in deep cuts, supporting walls along the right-bank service road, noise protection measures in residential areas, and modifications and connections of lower-class roads will be implemented.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 575385-2026HTML
- TED PDF — 575385-2026PDF
- TED XML — 575385-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.