Power supply infrastructure for Port Polska: RPZ buildings, GPO-C station, generator buildings, and 110 kV cable lines
Construction of power supply infrastructure for the Port Polska investment: RPZ buildings (110 kV/15 kV), GPO-C station building (110 kV/15 kV), generator station buildings, and 110 kV cable lines connecting to the national power grid. The contract comprises 7 tasks under a single agreement: construction and design work for the connection to the 110/110 kV PGE Station with 110 kV lines on the eastern and southern side of the airport (Task 1); construction and design work for the Distribution Point Stations RPZ-1, RPZ-2, RPZ-3, RPZ-4, each with a SCADA system (Tasks 2-5); construction and design work for the connection to the 400/110 kV PSE Station with 110 kV lines on the western and northern side of the airport (Task 6); construction and design work for the GPO-C station with 110 kV grid connection and SCADA system (Task 7).
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0001RESTRICTED-DOCUMENT
- TED HTML — 592040-2026HTML
- TED PDF — 592040-2026PDF
- TED XML — 592040-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.