Power Supply Infrastructure for Port Polska: RPZ, GPO-C Stations, Generator Buildings, and 110 kV Cable Lines
Power supply infrastructure for the Port Polska investment: construction of buildings for RPZ (110 kV/15 kV), GPO-C (110 kV/15 kV), and generator stations, along with 110 kV cable lines for connection to the national power grid. The contract comprises 7 tasks under a single agreement: construction and design work for the connection to the 110/110 kV PGE Station with 110 kV lines on the east and south sides of the airport (Task 1); construction and design work for the RPZ stations RPZ-1, RPZ-2, RPZ-3, RPZ-4, each with a SCADA system (Tasks 2-5); construction and design work for the connection to the 400/110 kV PSE Station with 110 kV lines on the west and north sides of the airport (Task 6); construction and design work for the GPO-C station with 110 kV grid connection and SCADA system (Task 7). Further details are described in the tender documents (OPW).
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0001RESTRICTED-DOCUMENT
- TED HTML — 566374-2026HTML
- TED PDF — 566374-2026PDF
- TED XML — 566374-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.