Technical Equipment for the Upgrade of Airport Tunnel B312
Firefighting system: Manufacturing, delivery, ready-for-operation assembly, and commissioning of a high-pressure water mist system for the Airport Tunnel B312. The tunnel is 509 m long, with a clear width varying between 8.40 m in the old tunnel section and 11.50 m in the new tunnel section. Access to the tunnel and operating building is landside; access to the pump house is airside, within the security area of Stuttgart Airport. Construction is scheduled from January to August 2027 under full tunnel closure. Lots 1 and 3 to 5 will be tendered separately.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 595004-2026HTML
- TED PDF — 595004-2026PDF
- TED XML — 595004-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.