Skip to main content
Activeted-515393-2026

Technical Equipment for Replacement New Building BUW Ammendorf, Halle Tram Program

Technical equipment for the replacement new building BUW Ammendorf: control room floor, medium-voltage switchgear (7 fields, 15/20 KV), 2 rectifier transformers (1,800 KVA), 1 auxiliary power transformer (75 KVA), 1 local grid isolation transformer (75 KVA), 1 DC system (600/750 V, 5,000 A, 12 fields), auxiliary power switchgear (11 fields for 440/230 V AC), emergency power supply (UPS 230 V and 60 V DC), mast switch controls, communication systems for structured cabling (fiber optic/copper, 3 fields), fire alarm system, measurement and metering devices for low and medium voltage, remote control systems (FWT) including connections to HAVAG FWT, cables, cable trays and installations in the building, as well as lightning protection and potential equalization.

CONTRACTING AUTHORITY

Name

Hallesche Verkehrs-AG

City

Halle (Saale)

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45232220, Substation construction work.

ADDITIONAL DETAILS

Suitable for SMEs

No

Electronic Submission

Required

Legal Basis

32014L0025

DEADLINES & TIMELINE

Submission Deadline

17 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

17 days remaining

Similar Tenders

Explore CPV 45

Underground cable construction for Halle tramway

Renewal of power and communication cables as part of the Halle tramway program. This includes earthworks, cable laying, and the installation of shafts and distribution boxes.

Hallesche Verkehrs-AG

·Halle (Saale)
Deadline:August 11, 2026

Timber Construction Services for New Building

Timber construction services in the new building area above the 1st floor reinforced concrete slab: Walls as timber panel walls (prefabricated parts), ceilings as CLT ceiling construction, partly with ribs. Cladding of the timber panel walls with gypsum fiber boards inside and outside. Ceilings rest on columns and beams made of laminated veneer lumber or glulam. Consideration of static specifications from released position plans of the execution statics, as well as integrated own factory and assembly planning into the execution planning. Thermal insulation and sound insulation requirements are to be considered. Areas for temporary site setup and and use as intermediate storage for accumulating material are available; water, electricity, and sewage connections are provided through a separate award for central site facilities. Main services for the 2nd to 4th floor include factory and assembly planning as well as cutting planning for all timber components; manufacturing, delivery, and assembly of timber panel walls including cladding; manufacturing, delivery, and assembly of columns, main and secondary beams made of laminated veneer lumber or glulam; manufacturing, delivery, and assembly of CLT ceilings with and without ribs including re-anchoring to reinforced concrete components.

ringberlin Halle 2 Projektgesellschaft GmbH

·Berlin
Deadline:August 26, 2026

Successive Maintenance Work on Electrical Installations

Maintenance work on electrical installations: successive execution.

Institut »Jožef Stefan«

·Ljubljana
Deadline:August 27, 2026

Modernization of the Irrigation System at Villadangos Canal (León), Phase II

Construction works for the modernization of the irrigation system at Villadangos Canal (León), Phase II: Execution according to the approved implementation project dated June 12, 2026, including pipeline construction, irrigation works, and reservoir construction.

Sociedad Mercantil Estatal de Infraestructuras Agrarias, S.A. (SEIASA)

·Madrid
Deadline:August 24, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now