Temporary pumping station for the Berlin Spandau lock
Planning and construction of a temporary pumping station at Spandau lock: includes calculations, static and hydraulic proofs, execution planning, assembly, and commissioning. The system is designed for an operating period of approximately 15 years, integrated as a fully reversible construction into the existing lock structure, and consists of a pump support cage, a shaft pump, a DN-800 pressure line, and an automatic screen cleaning system. The foundation is a pile foundation executed with a low-vibration method.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- No IDNON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.