Civil engineering, pipeline, and road construction works for new construction HB Spitzenstein / Abzweig Kasdorf to HB Bogel
Civil engineering, pipeline, and road construction works for the new construction HB Spitzenstein / Abzweig Kasdorf to HB Bogel: Removal and re-application of approx. 105 m³ topsoil, creation of a pipeline zone of approx. 1,210 m³, removal of approx. 1,360 m³ trench excavation, surcharge for trench excavation in homogeneous area IV rock of approx. 1,560 m³, temporary storage and re-installation of approx. 1,980 m³ trench excavation, trench backfill with approx. 150 m³ replacement material, installation of approx. 5,680 m² trench shoring, laying of approx. 2,091 m water pressure pipes DA 225, approx. 2,100 m cable protection pipe DA 50, and approx. 2,100 m control cables.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 597928-2026HTML
- TED PDF — 597928-2026PDF
- TED XML — 597928-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.