Civil engineering works for terminal routes
Road construction in asphalt: approx. 12,100 m²; Pipeline construction for drinking and fire-fighting water supply with HDPE pipes (DN80 to DN150): approx. 3,070 m; Installation of district heating and cooling pipes (DN100 to DN350): approx. 3,330 m; Drainage channels (DN150 to DN300) at laying depths of over 1.50 m to 5.50 m: approx. 1,960 m; Drainage manholes (DN1000 to DN2000) up to 5.50 m: 65 units; Rainwater filter shafts up to DN1500: 15 units; Infiltration and sedimentation systems as plastic box culverts with a volume of approx. 1,300 m³; Cable duct system made of DN150 PP pipes: approx. 1,370 m; Reinforced concrete cable manholes in various nominal widths: approx. 45 units; Earthworks for backfilling between excavation pits GGB1 and GGB2: approx. 11,000 m³.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 508020-2026HTML
- TED PDF — 508020-2026PDF
- TED XML — 508020-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.