Structural Engineering for Extension with Triple Sports Hall and Building Demolition, Josef-Hofmiller-Gymnasium Freising
Structural engineering planning phases 1-6 and the optional engineering control of planning phase 8 according to HOAI 2021 for the new construction of an extension with an integrated triple sports hall and science classrooms for the Josef-Hofmiller-Gymnasium in Freising. The contract includes the demolition of the existing swimming and sports hall, building section “Bauteil B, West” (built 1959), the multi-purpose hall with swimming pool and the double sports hall (built 1972), as well as the caretaker's house with 4 residential units and garages. Also included are the reorganization and qualification of outdoor facilities and sports areas, as well as the planning of the excavation pit shoring according to § 41 HOAI 2021 engineering structures as a separate object, and demolition statics. The planning is based on variant D of a feasibility study and considers a terraced, 3- to 4-story building on a slope with an integrated sports hall from ground level, large spans over 25m, and the necessity of special civil engineering. Estimated construction costs (cost groups 200-600) are approximately 23 million Euro gross. The commissioning will be phased according to § 51 HOAI, starting with planning phases 1 and 2. Planning is expected to begin in October 2026, construction in Q3 2028, and commissioning in Q1 2030. Demolition and new construction will take place during ongoing school operations.
CONTRACTING AUTHORITY
Name
Landkreis Freising
City
Freising
Country
DE
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Services
Main CPV
71327000, Load-bearing structure design services.
Other CPV
71300000, Engineering services.
71000000, Architectural, construction, engineering and inspection services.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
32 days remaining(LOT-0000)
Published