Skip to main content
All tenders

Transformation Plan for Templin South District Heating Network

Status
Active
Submission Deadline
28 days remaining
Location
Templin, Germany
Procedure
Negotiated procedure with prior call for competition · Services
Category
Energy and related services.Energy-efficiency consultancy services.Geology services.
Published
Reference
ted-601112-2026

Consulting, modeling, planning, and coordination services for the decarbonization of the Templin South district heating network and for the creation of a transformation plan according to the Federal Funding for Efficient District Heating Networks (BEW), Module 1. The district heating network supplies 39 buildings with 875 residential units via approximately 3.9 km of pipeline and is currently fully operated with three natural gas boilers. The contract includes three positions: 1. General coordination and energy system modeling with overall coordination, interface management, energy system modeling for the generation park, storage and flexibility options, and the decarbonization path until 2045, modeling of network hydraulics, characteristic value and sensitivity analyses, reporting, and input for the transformation plan. 2. Deep geothermal planning services with review of the existing feasibility study, Basis of Design, preliminary design (LP 3), and approval planning (LP 4) for underground (geology, reservoir engineering, drilling site and drilling technology planning including casing design and disposal concept) and above-ground (thermal water circuit, heat pump system, operational building with building services, electrical/instrumentation/control, structural engineering, fire protection, district heating pipeline, medium voltage connection), plus special reports, regulatory pre-assessment with strategy, economic evaluation, and overall project and interface management. 3. Creation of the transformation plan with inventory analysis, target vision, measures path, decarbonization scenario, timeline, investment and cost analysis, risk and implementation assessment, and integration of results from positions 1 and 2. Additionally, infill development and network expansion in the South network area, as well as the option of merging with the North network area, are to be investigated. Evaluation criteria are supply security, economic efficiency, and sustainability in the decarbonization path until 2045.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

We call you once briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Tender documents

  • Portal — LOT-0001NON-RESTRICTED-DOCUMENT
  • TED HTML — 601112-2026HTML
  • TED PDF — 601112-2026PDF
  • TED XML — 601112-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

We call you once briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0025
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?