Combined Sewer Separation and Infrastructure Reconstruction in Płock
Construction works for the separation of the combined sewer system into sanitary and storm sewers, and the reconstruction of technical infrastructure in Norbertańska, Świerkowa, Partyzantów, Głowackiego, and Batorego streets in Płock city center. This includes the construction of new storm sewer sections with house connections and storm drains for road drainage, surface restoration, and the renovation of existing technical infrastructure. The contractor is obliged to protect roads and engineering structures from damage, adhere to axle load limits, secure construction sites, especially open excavations at dusk and at night, and restore surfaces immediately after network construction, obtaining a formal acceptance from the road manager.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 559726-2026HTML
- TED PDF — 559726-2026PDF
- TED XML — 559726-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.