Separation of Combined Sewer System and Reconstruction of Infrastructure in Płock
Construction works for the separation of the combined sewer system into sanitary and storm sewers and the reconstruction of technical infrastructure in Norbertańska, Świerkowa, Partyzantów, Głowackiego, and Batorego streets in Płock. This includes the construction of new storm sewer sections with house connections and road drains for road drainage, the separation of the existing combined sewer system into distinct sanitary and storm water systems, surface restoration, and the reconstruction of existing technical infrastructure. The contractor is obliged to protect roads and engineering structures from damage, secure work sites, and restore surfaces immediately after network construction, including obtaining formal acceptance from the road manager.
CONTRACTING AUTHORITY
Name
"Wodociągi Płockie" Sp. z o.o.
City
Płock
Country
PL
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
45100000, Site preparation work.
45110000, Building demolition and wrecking work and earthmoving work.
45200000, Works for complete or part construction and civil engineering work.
45231000, Construction work for pipelines, communication and power lines.
45231300, Construction work for water and sewage pipelines.
45232400, Sewer construction work.
45262600, Miscellaneous special-trade construction work.
45232410, Sewerage work.
45310000, Electrical installation work.
45311000, Electrical wiring and fitting work.
45112710, Landscaping work for green areas.
45233120, Road construction works.
45233252, Surface work for streets.
45233222, Paving and asphalting works.
45400000, Building completion work.
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
32 days remaining(LOT-0001)
Published