Drywall and Interior Finishing Works after Window Renewal
Drywall and interior finishing works in the facade connection area after window renewal: Supplementation of drywall partitions in the window and facade sword areas (approx. 100 m), supplementation of mineral fiber grid ceilings (approx. 500 m²) and gypsum plasterboard suspended ceilings (approx. 100 m²). Painting and varnishing works on facade-side walls in interior spaces: parapets and radiator mirrors (approx. 400 m²), concrete columns (approx. 580 m²), other overhaul coating (approx. 70 m²), ceiling coatings (approx. 100 m²). Floor covering additions on the ground floor in the area of the new facade: approx. 20 m linoleum flooring, concrete slab additions at the main entrances (approx. 250 × 30 cm).
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 563664-2026HTML
- TED PDF — 563664-2026PDF
- TED XML — 563664-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.