Drywall and Painting Works for Creative Forum, Cleantech Innovation Park
Drywall and painting works for the new Creative Forum building at the Cleantech Innovation Park in Hallstadt. The four-story building, without a basement, features wood-hybrid construction with an attached steel structure, a maximum building height of 16.30 m above ground floor finished floor level, building dimensions of 41.65 m x 26.65 m, and a gross floor area (GFA) of approx. 3,650 m². Services include: approx. 268 m² partition walls (single stud frame), approx. 217 m² partition walls (double stud frame), approx. 23 m² partition walls (furring wall), approx. 11 m² cement board wall cladding, approx. 18 m² dry plaster, 10 pcs. wall tapers, approx. 953 m² suspended ceiling sheep wool with insulation layer (flame-retardant), approx. 832 m² suspended ceiling sheep wool with insulation layer (flame-retardant), approx. 160 m² suspended ceiling gypsum boards (single-layer), approx. 24 m² suspended ceiling gypsum boards (double-layer, EI 90), approx. 180 m² wood component cladding with fire protection board, 13 pcs. ceiling mounts for built-in elements, approx. 224 m² single-track curtain rails, approx. 52 m² motorized curtain rails, approx. 525 m² curtain fabric (sound insulation, privacy screen), approx. 243 m² curtain fabric (sound insulation, blackout), and approx. 296 m² painting works (primer, finish coat).
CONTRACTING AUTHORITY
Name
Cleantech Innovation Park GmbH
City
Hallstadt
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45324000, Plasterboard works.
Other CPV
45421141, Installation of partitioning.
45421146, Installation of suspended ceilings.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
28 days remaining(LOT-0001)
Published