Drywall works for radiation bunker
Drywall works for the expansion of supply and disposal facilities in the first construction phase of a new radiation bunker on the clinic premises right of the Isar: 65.00 m² F90 curtain wall, 11.00 m² F0 curtain wall, 47.5 m² double-planked metal stud walls with sound insulation requirements, 15.1 m² F0 acoustic ceiling with wood wool multi-layer panels, 25.5 m² acoustic cladding of the raw ceiling with wood wool multi-layer panels, 17.6 m² suspended plasterboard ceiling for wet rooms, 65 m² F90 fire protection cladding for trapezoidal sheet metal roof, 3 units single-leaf wooden interior doors including steel frame, 42 m² revisable raised floor.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 545071-2026HTML
- TED PDF — 545071-2026PDF
- TED XML — 545071-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.