Overhaul of Gas Turbine System GT10 for CHP Plant Köpenick
Overhaul of gas turbine system GT10 at CHP Plant Köpenick: The turbine unit from manufacturer Solar Turbines, type Taurus 60, consisting of gas turbine and gearbox, will be revised according to manufacturer specifications. This includes removal and reinstallation of components after factory overhaul or the use of revised replacement units. Overhaul of gas turbine and gearbox (alternatively delivery of revised components), removal of dismantled components, if required, inspection in a test field, FAT for testing specified properties, dismantling and assembly work, provision of all necessary tools and aids, commissioning, and comprehensive documentation. Timeframe: April 01 to September 30, 2027. A repair concept must be submitted.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 511098-2026HTML
- TED PDF — 511098-2026PDF
- TED XML — 511098-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.