Bus Stop Reconstruction Bischhagen
Reconstruction of the bus stop in Bischhagen: removal and disposal of approx. 35 m³ of sub-base material, installation of approx. 38 m³ of sub-base material, installation of approx. 6 m³ of soil/topsoil, removal of approx. 85 m² of concrete block paving and concrete slabs, installation of approx. 85 m² of concrete block paving, installation of approx. 38 m of special, high, round, and deep kerbstones as well as concrete edging strips (of which 15 m are Kasseler special kerbs), removal and restoration of approx. 30 m² of asphalt surface, removal and reinstallation of 1 unit of road drain including connection line, delivery and installation of 1 unit of weather protection facility. Execution period: 14.10.2026 to 30.04.2027. The award criterion is the lowest price. Security for contract fulfillment: 5% of the contract sum, if it amounts to at least 250,000 EUR excluding VAT. Security for defect claims: 3% of the sum of interim payments at the time of acceptance. Further details on securities as per the tender documents. Proof of suitability via prequalification or self-declaration of suitability. The measure is supported by funding for municipal transport infrastructure (KVI).
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- 25714072NON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.