Traffic Management for Highway Construction Project BAB A30 Melle

Traffic safety for a highway construction project: extensive traffic safety measures for the replacement new constructions of two bridge structures along BAB A30 in the Melle area, including multi-phase traffic guidance (3+3 / 2+2) on BAB A30, approximately 360 - 380 days of traffic safety over the entire construction period, 1-lane traffic guidance on K206 over the entire construction period, approximately 5 weekend full closures of BAB A30 (structure-related, directional), full closure of K206 and Wellingstraße during the construction period, establishment and operation of diversion routes, traffic signs, marking and de-marking works as well as additional signage, use of portable safety barriers and traffic light systems, ongoing control, maintenance, and upkeep of all traffic safety measures.

CONTRACTING AUTHORITY

Name

Die Autobahn GmbH des Bundes - NL Westfalen

City

Hamm

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45233124, Trunk road construction work.

Other CPV

45000000, Construction work.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

allowed

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

30 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

30 days remaining

Similar Tenders

Explore CPV 45

Road Renewal on Motorways BAB 1 and BAB 2 near Kamen

Road renewal measures as surface rehabilitation at various locations on federal motorways within the responsibility of the Kamen motorway maintenance depot. The maintenance measures concern the asphalt binder and surface layers over a total length of approx. 4100 m. The main services include the installation of asphalt binder layer made of AC 22 B S and asphalt surface layer made of SMA 8 S, as well as traffic management. Road construction dominates the measure.

Die Autobahn GmbH des Bundes - NL Westfalen

·BAB 1 und BAB2 im Einzugsgebiet AM Kamen
Deadline:July 21, 2026

Compensation Measure for the A40 near Bochum

The construction measure comprises the conversion of the Bochum-Zentrum interchange on the A40 in the direction of Dortmund and in the direction of Essen. The work includes extensive milling and asphalt paving work for surface renovation, as well as the dismantling of a traffic sign gantry and the construction of two traffic sign cantilever arms. In addition, the end profile at the Herner Straße structure will be renovated, and temporary and new AUSA protective pipe routes including cable laying will be established. The measure is dominated by road construction and structural engineering.

Die Autobahn GmbH des Bundes - NL Westfalen

·Bochum
Deadline:July 29, 2026

Road Construction for RWBA Kortelbach

Extensive civil engineering works for the RWBA Kortelbach, including earthworks, pipe laying, and asphalt base construction. This also covers the erection of a concrete structure and shafts.

Die Autobahn GmbH des Bundes - NL Westfalen

·Hamm
Deadline:July 09, 2026

Road Repair A46/A43 at Wuppertal Nord Interchange

Repair work on the federal motorways A46/A43 in the area of the Wuppertal-Nord motorway interchange and on the junction structure BW 4609 602 near Sprockhövel/Haßlinghausen. The measure essentially comprises structural repair services on traffic routes and engineering structures. The schedule of services includes a long-text list with 197 sheets. The main trades are road construction and bridge construction, with the structural repair of engineering structures and road surfaces being the primary focus.

Die Autobahn GmbH des Bundes - NL Westfalen

·A43/A43 AK Wuppertal Nord
Deadline:July 31, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now