Extension of process water pipeline and connection of well and rainwater for Hennickendorf composting plant
Civil engineering works for the Hennickendorf composting plant: Construction and backfilling of trench lines for pressure pipelines, supply and laying of DN 100 process water pipelines, supply and installation of underground hydrants. Additionally, construction of rainwater trench lines, crossing of existing pipelines and obstacles, supply and installation of construction pits and pressure pipelines PE 100/160 x 14.6 and PE 100/125 x 11.4, supply and installation of fittings, construction of trench lines for well water, cutting of asphalt, removal of asphalt curbs, supply, installation and compaction of backfill soil, construction of a gravel sub-base layer from aggregate mixture 0/32, supply and setting of concrete high and low curbs, supply and installation of concrete block paving in unbound construction, and production of bituminous joint sealing.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- 25666814NON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.