Skip to main content
Activeted-497290-2026

Maintenance of HVAC Systems and Air Conditioners

Technical building services: Maintenance, troubleshooting, and cleaning of HVAC systems and air conditioners, awarded as a framework agreement with two contractors.

CONTRACTING AUTHORITY

Name

Kölner Verkehrs-Betriebe AG

City

Köln

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Services

Main CPV

50711000, Repair and maintenance services of electrical building installations.

LOTS (2)

LOT-0001Services

Wartung RLT-Anlagen und Klimageräte linksrheinisch

LOT-0002Services

Wartung RLT-Anlagen und Klimageräte rechtsrheinisch

ADDITIONAL DETAILS

Suitable for SMEs

No

Electronic Submission

Required

Legal Basis

32014L0025

DEADLINES & TIMELINE

Submission Deadline

31 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

31 days remaining

Similar Tenders

Explore CPV 50

Low-floor light rail vehicles and spare parts supply for Cologne

Design, manufacturing, and delivery of up to 113 low-floor light rail vehicle units according to BOStrab and EBO for use in Cologne and on the non-federal railway lines of Häfen- und Güterverkehr Köln AG (HGK), plus long-term spare parts supply. A mandatory purchase of 69 vehicle units is required (minimum purchase quantity), with an option to call off up to 44 additional units as needed via a framework agreement. The vehicle units are low-floor trams, articulated railcars with bogies and spherical plain bearings, designed as bidirectional vehicles for operational use in single, double, triple, and quadruple traction. Key requirements include: car body shell made of steel (welded construction), vehicle width 2,650 mm (+0 mm / -10 mm), vehicle length 27.5 m to max. 30.0 m, ground clearance ≥ 80 mm, overhead line nominal voltage 750 V DC, minimum curve radius 25 m, track gradient ≤ 6 %, length of the longest maximum track gradient 500 m, track gauge 1,435 mm, maximum speed 80 km/h (designed for 85 km/h), wheelset load (axle load) ≤ 100 kN, track load max. 21.7 kN/m, bogie wheelbase 1,800 mm or 2,100 mm, nominal floor height (entry) 400 mm. Delivery of 3 pre-series vehicles is planned for the third quarter of 2030, with series vehicles delivered ready for operation from the end of 2031 on a bi-weekly basis.

Kölner Verkehrs-Betriebe AG

·Köln
Deadline:August 06, 2026

Replacement of Escalators in Cologne

We are looking for an experienced partner to replace a total of 36 escalators in public transport. This is an important measure for modernizing the infrastructure.

Kölner Verkehrs-Betriebe AG

·Köln
Deadline:August 03, 2026

Platform Extension for Longer Trains in Cologne

To accommodate rising passenger numbers, 21 platforms in Cologne will be extended to enable the deployment of 34 new, longer trains starting in 2026.

Kölner Verkehrs-Betriebe AG

·Köln
Deadline:July 27, 2026

Track Renewal Branch Line Cologne Stadium

Renewal of the track superstructure for a single-track branch line to the Rhein-Energie-Stadion in Cologne. This ensures the future operational capability of the line.

Kölner Verkehrs-Betriebe AG

·Köln
Deadline:July 24, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now