Water pipeline connection between Turie and Višňové
Construction work for a water pipeline connection from drinking water sources in the Turie area to Višňové: total pipeline length 4,171.55 m; an automatic pumping station (ATS) is planned to transport drinking water to the Višňové water reservoir (VDJ). The pipeline after the ATS is designed as an inlet pipe made of material D 160x14.6 mm, HD PE, PE 100 RC, SDR 11 with a length of 3,056.05 m, and from the ATS as a discharge pipe D 125x7.4 mm, HD PE, PE 100 RC, SDR 17 with a length of 1,115.50 m. The section of the inlet pipeline from Turie to the ATS is divided into two stages: Stage 1 from Turie to the reduction shaft near the Višňové municipal office with a length of 1,898.62 m; Stage 2 from the reduction shaft to the ATS with a length of 1,157.40 m.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 572463-2026HTML
- TED PDF — 572463-2026PDF
- TED XML — 572463-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.