Replacement of hot water meters
Replacement of hot water meters: Exchange of meters in objects specified by the contracting authority using meters provided by the contracting authority, sealing of the replaced meters, and preparation of written or mobile application-based work reports. If required by the contracting authority or determined by the contractor, preventive water flow check valves must be installed in the meter construction to prevent backflow in the hot water piping system; these valves must be procured by the contractor at their own expense. A preliminary quantity of services is being procured.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 543515-2026HTML
- TED PDF — 543515-2026PDF
- TED XML — 543515-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.