Tools and Equipment for Construction Studies, Engineering, and Electronics at Ardscoil La Salle, Raheny
Supply, installation, and maintenance of tools and equipment for teaching Construction Studies and Engineering at Ardscoil La Salle, Raheny, based on specifications by the Department of Education and Youth (DEY) for post-primary schools. Supply and installation by 1st December 2026. The procurement is divided into 3 lots: Construction Studies-Wood Technology, Engineering, and Electronics.
CONTRACTING AUTHORITY
Name
Ardscoil La Salle (Raheny)
City
Dublin
Country
IE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Supplies
Main CPV
42600000, Machine tools.
Other CPV
42642100, Machine tools for working wood.
42621000, Lathes.
43812000, Sawing equipment.
39292300, Drawing instruments.
43830000, Power tools.
43130000, Drilling equipment.
43312100, Planers.
31710000, Electronic equipment.
31711000, Electronic supplies.
31711100, Electronic components.
35721000, Electronic intelligence system.
42991200, Printing machinery.
42662000, Welding equipment.
42642100, Machine tools for working wood.
42621000, Lathes.
43812000, Sawing equipment.
39292300, Drawing instruments.
43830000, Power tools.
43130000, Drilling equipment.
43312100, Planers.
31710000, Electronic equipment.
31711000, Electronic supplies.
31711100, Electronic components.
35721000, Electronic intelligence system.
42991200, Printing machinery.
42662000, Welding equipment.
42642100, Machine tools for working wood.
42621000, Lathes.
43812000, Sawing equipment.
39292300, Drawing instruments.
43830000, Power tools.
43130000, Drilling equipment.
43312100, Planers.
31710000, Electronic equipment.
31711000, Electronic supplies.
31711100, Electronic components.
35721000, Electronic intelligence system.
42991200, Printing machinery.
42662000, Welding equipment.
LOTS (3)
Bautechnik und Holztechnologie
€300,000
Ingenieurwesen
€300,000
Elektronik
€300,000
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
39 days remaining(LOT-0001)
Published