Øygarden 132kV Totalentreprise
The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation), including coordination and integration between them. The 145 kV GIS switchgear is not included in this procrument. However the contractor shall ensure all necessary provisions for installation, interfaces, and integration with this system. The station will include functions such as a control room, technical rooms (fiber, battery, and distribution), backup power, GIS room, cable basement, and locker room facilities.
CONTRACTING AUTHORITY
Name
BKK AS
City
Bergen
Country
NO
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Works
Main CPV
45231000, Construction work for pipelines, communication and power lines.
Other CPV
37823900, Kraftliner.
45232221, Transformer substation.
45262311, Concrete carcassing work.
45315400, High voltage installation work.
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
other
DEADLINES & TIMELINE
Submission Deadline
53 days remaining(LOT-0001)
Published