ERTMS/ETCS Level 2 System for Railway Lines 133 and 91, Kraków Główny – Podłęże Section
Notice title: Zaprojektowanie i wykonanie robót dla zadania pn.: „Zabudowa systemu ERTMS/ETCS poziomu 2 na liniach kolejowych nr 133 i 91 odc. Kraków Główny – Podłęże” w ramach projektu „Zabudowa systemu ERTMS”.
Design and construction of an ERTMS/ETCS Level 2 system for railway lines 133 and 91, Kraków Główny – Podłęże section: preparation of preliminary documentation (design concept, project data preparation rules, operational scenarios, railway traffic rules, test cases), design documentation for all construction works, technical-operational documentation according to Ie-100a, as-built documentation including geodetic survey, execution of all construction and preparatory works, conformity assessment of the structural subsystem "Control – trackside devices" at all stages, and obtaining the operating permit for the structural subsystem. The implementation period is 26 months from contract signing, with completion of works, handover of as-built documentation, and certification documents after 20 months, and operating permits and final acceptance after 26 months. Optional services include the extension of scope on railway line 91, Kraków Bieżanów – Podłęże section (km 10.918 to km 19.880) including RBC – RBC Handover (to RBC Tarnów), to be executed within 18 months of activation; and changes to installed ERTMS/ETCS Level 2 devices to ensure RBC – RBC Handover function with ETCS Level 2 systems on adjacent lines, to be executed within 4 months of activation. further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 631549-2026HTML
- TED PDF — 631549-2026PDF
- TED XML — 631549-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.