Centrifuge Replacement for Biatorbágy Wastewater Treatment Plant
Delivery and installation of a new centrifuge: Replacement of one HYSEP MD 43 C/2 centrifuge with a new HAUS DDE 3542 or equivalent centrifuge at the Biatorbágy Wastewater Treatment Plant. The service includes delivery, installation, potentially technological, electrical, and structural modifications, integration into the plant's electrical system, commissioning, trial operation, and training of operating personnel. The new centrifuge must fit into the existing system, which includes one primary HAUS DDE 3542 and one secondary HYSEP MD 43 C/2 centrifuge, both utilizing a common sludge discharge unit. Work must be carried out while the remaining centrifuge is operational. The HAUS DDE 3542 centrifuge has a load capacity of 289 kgSZA/h; further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 595972-2026HTML
- TED PDF — 595972-2026PDF
- TED XML — 595972-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.