Skip to main content
All tenders

Carpentry and Timber Construction for U-shaped Building

Status
Active
Submission Deadline
32 days remaining
Location
München, Germany
Procedure
Open Procedure · Works
Category
Carpentry installation work.
Published
Reference
ted-680002-2026

Carpentry and timber construction for a U-shaped building with an inner courtyard, featuring exterior wall lengths of 2 x 65.70 m, 40.52 m, 25.38 m, and 8.80 m, inner courtyard wall lengths of 2 x 56.60 m, 23.02 m, 16.78 m, 2 x 8.80 m, and building heights of 3.65 m and 5.15 m. Stud walls are made of Spruce/Fir softwood C24 with claddings of solid wood panels SWP/2 S DIN EN 13353 three-layer panels and OSB utility class 0, OSB/3. This includes load-bearing timber frame constructions REI30 (AW 508 m²), load-bearing REI30 with installation level (AW 35 m²), load-bearing EI30 with installation level (IW 66 m²), load-bearing EI30 (IW 51 m²), non-load-bearing (AW 64 m²), non-load-bearing (IW 48 m²), of which 35 m² are insulated timber frame constructions, 35 m of reveal cladding, and a proportional vapor barrier under stud walls (IW 49 m²). Timber roofs and ceilings consist of cross-laminated timber DIN EN 16351 (REI 30, Spruce/Fir softwood C24, pre-greyed) for main roofs, sawn timber (Spruce/Fir softwood C24) for canopy purlins and beams, and workshop ceiling beams, with formwork made of OSB/3 and softwood 3-layer panels. This comprises 1,435 m² of cross-laminated timber ceilings, 0.7 m³ of canopy (purlins, beams, steel rafters), 36 m² of canopy roof formwork OSB/3, 36 m² of visible canopy ceiling formwork made of pre-greyed tongue and groove softwood boards, and 39 m² of insulated workshop ceiling with softwood beams and formwork on both sides. Steel construction works involve the supply and installation of S235J2 hot-dip galvanized steel with factory corrosion protection: 2,097 kg of profile steel beams HEB240, 996 kg of HEB200, 385 kg of HEB160, 607 kg of welded T-steel, 132 kg of round columns DN 139.7, and 88.5 kg of steel parts (head/base plates, bracing). Ventilated timber facades are made of rough-sawn, pre-greyed silver fir with a substructure of battens/counter-battens Spruce/Fir softwood C24: 956 m² of timber battens 30/50 and 40/60 vertically laid with an irregular arrangement of alternating profiles (horizontal/vertical), 265 m² of timber battens 20/65, 20/90 and 20/140 vertically laid with an alternating arrangement, 561 m of small animal protection, and 27 m of overhang strips made of galvanized, powder-coated steel. Overarching services include site setup, workshop and assembly planning, and static calculations based on verification.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

We call you once briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Tender documents

  • Portal — LOT-0000NON-RESTRICTED-DOCUMENT
  • TED HTML — 680002-2026HTML
  • TED PDF — 680002-2026PDF
  • TED XML — 680002-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

We call you once briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

EU Funded
No
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024

Similar tenders

Explore CPV 45

Current tenders in CPV division 45 are listed on the Akademie page for this category.

Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?