Temporary warming Botsen
Statsbygg requests tenders for temporary heating of Botsen.The aim is to establish a reliable and comprehensive system for heat production based on pellets, where the tenderer is responsible for the total responsibility for the energy delivery. Buildings and energy need Property: BotsenHeated building area: approx. 17,000 m² Estimated annual energy consumption: approx. 450,000 kWh Estimated highest energy need per month: approx. 90,000 kWhEseen the highest energy need per hour: 150 kWTur temperature at the connection point must be delivered at minimum 55 degrees for an effect need of 150 kW.The energy shall only be used for heating. The building is currently heated by district heating, which it receives from the existing prison, which is still active. This system will be disconnected from 15.02.27.
Keine Ausschreibungen mehr verpassen
Wir schicken Ihnen 3 aktuelle Treffer, die zu Ihrem Unternehmen passen.
Auftragsdokumente
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 618546-2026HTML
- TED PDF — 618546-2026PDF
- TED XML — 618546-2026XML
Dokumente kostenlos freischalten
Geben Sie Ihre E-Mail-Adresse ein. Auf Wunsch schicken wir Ihnen außerdem 3 ähnliche Ausschreibungen.