Improvement of Fish Downstream Migration at Bazacle Hydropower Plant
Notice title: 31 BAZACLE – Continuité écologique : amélioration dévalaison piscicole à l’usine du Bazacle (31)
Construction works for the improvement of ecological continuity at the Bazacle hydropower plant: Installation of a horizontal fish screen, oriented at 31°, and all associated equipment. This includes site installation, site base, and site dismantling, dewatering of the area by creating an empty sheet pile coffer dam, pumping leaks, and underwater sheet pile recapping at the end of the project (sheet pile protection level 134.6 mNGF, refusal to drive sheet piles between 127.5 mNGF and 123.5 mNGF, total linear length (in plan) of sheet piles increased by 10%: 220 ml). Also included are the removal and demolition of existing equipment (concrete sawing, removal of hydromechanical equipment), execution of civil engineering works (foundation slab, piers, other small structures), and the construction of a fish-friendly horizontal bar screen and its supports (tolerance of +/- 10%, screen length = 73 m, height between base and top of screen = 3.85 m, height between screen base and screen cleaner platform = 4.75 m, bar spacing = 20 mm, bar type = fish-friendly tadpole shape, dimensioning with 100% clogged screen). Also included are the implementation of level measurements (upstream/downstream of the screen) in measurement wells to be created, the manufacturing and installation of a screen cleaning system including its dedicated automation (mobile horizontal screen cleaner(s), log grapple for the operator to remove large blockages with a capacity of 600 kg at 12 m, screen cleaner cabinet mounted on its travel carriage with dedicated automation capable of autonomous operation in the absence of head loss information in cyclic mode). Furthermore, the manufacturing and installation of a grapple crane, the manufacturing and installation of an upstream migration channel (tolerance of +/- 10%, semi-cylindrical shape with 3 m width and 1.7 m overall height, length (axis) = 76 m), the manufacturing and installation of the supporting structure (supporting civil engineering walls/metal structure), the manufacturing and installation of hydromechanical equipment (tolerance of +/- 10%, gate valve with 3.55 m height and 1 m width, replacement of a flap valve with 0.75 m height and 4 m width with double-acting cylinder). Also, the creation of a fish downstream migration/debris removal channel (demolition/reconstruction civil engineering, installation of a metallic separation structure between 2 channels), the creation of an eel pass (macroplot slab), the manufacturing and installation of additional safety equipment (guardrails, gratings, lifeline), the renovation of the entire water intake control system (distribution cabinet, automation cabinet including programming), the addition of an ePAH supervision system (CODRA PANORAMA E2), the execution of industrial commissioning tests (including preparation of test sheets), on-site surveys, the execution of dimensioning studies for new equipment, and the creation and updating of “as-built” plans (CAE) of the new installation and their integration into the existing set of plans (including updating existing plans, particularly electrical diagrams, modified by the new installations) and the delivery of associated study documentation. The operation is scheduled from July 2027 to December 2029, with a construction phase from May to November 2028 and an MSI phase in 2029 (1 year for the screen cleaner). further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 740081-2026HTML
- TED PDF — 740081-2026PDF
- TED XML — 740081-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.