Gieselteich Bridge and Retaining Wall for A20 Motorway
Notice title: A20, BL2.2 Gieselteichbrücke BW5.12 inkl. StW
Construction works for prestressed concrete slab beam bridge and retaining wall: prestressed concrete slab beam with separate superstructures over L 83 and DB railway line 1043, total length 371 m, width between railings 31.10 m, minimum clear height 4.735 m, supported construction with semi-integral design of pier axes 50 and 60, founded on large-diameter bored piles, partly watertight excavation shoring. Bridge: 18,700 m³ reinforced concrete, 3,600 t reinforcing steel, 360 t prestressing steel. Retaining wall: 1,500 m³ reinforced concrete, 160 t reinforcing steel. Earthworks: 15,800 m³ excavation, 14,000 m³ topsoil removal, 12,500 m³ soil loosening and temporary storage. Deep foundations: 4,800 m in-situ concrete bored piles DU 1.20 m, 550 t reinforcing steel. Bridge surfacing/sealing: approx. 9,000 m³ bridge surface.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 796970-2026HTML
- TED PDF — 796970-2026PDF
- TED XML — 796970-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.