Connection of a TiTra Heat Pump VE 06 to the Main Cooling Water Line
Construction and assembly services for connecting a TiTra Heat Pump VE 06 to the main cooling water line: Relocation, bridging, and partial dismantling of existing lines in the construction area for site clearance, creation of the excavation pit including shoring and dewatering, surface restoration, partial dismantling of the prestressed concrete main cooling water line, installation of the new PE connection module with special fittings, extraction and inlet lines, dismantling and reconnection of temporary bridging lines.
Missed this tender?
This deadline has passed. So it does not happen again: we send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 519614-2026HTML
- TED PDF — 519614-2026PDF
- TED XML — 519614-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.