Elevator construction for Freital Hainsberg West central platform
Construction of a barrier-free passenger elevator: earthworks, civil engineering, and foundation works, foundation using well foundation for the elevator, installation of foundation earthing, underpass with approx. 20 m³ in-situ concrete, approx. 28 m long retaining wall with railing, connection of the elevator structure to the existing construction, replacement and adaptation of the tactile paving system, establishment of supply and disposal connections for elevator operation, adaptation of track magnets for construction and final state. The siding for construction machinery is located approx. 200 m away on the premises of the road maintenance depot.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- 25658886NON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.