Pool Water Technology for Sauna Redesign Prinzregentenstadion
Notice title: SV-JWA-261112-001 - PRS: Neukonzeption Sauna Prinzregentenstadion, Badewassertechnik
Pool water technology: Renewal and expansion of pool water technical systems for the sauna redesign at Prinzregentenstadion in Munich. Services include demolition of approx. 300 m of pipes DN 15–200, 20 fittings, 10 displays/sensors, 3 UF modules, and 1 pre-filter system; new construction and adaptation of approx. 510 m of PVC-U pipes d 25–125 (clean water) and approx. 318 m of PE-HD pipes DN 50–160 (surge water), approx. 90 fittings/valves, cold and warm pool technology, measurement, control, and regulation technology, and the expansion of the ultrafiltration system from approx. 27 to 36 m³/h with 3 UF modules of 80 sqm each and 2 filter containers. Also included are 1 multi-layer filter system, modification of 1 surge/clean water tank, 2 plate heat exchangers, 2 heat exchanger pumps, 2 filter pumps, as well as measurement, dosing, control, and interface technology. Pools: 1 outdoor warm/massage pool (approx. 10.42 sqm), 1 outdoor cold water plunge pool (approx. 1.77 sqm), built-in parts for 1 indoor Kneipp and 1 indoor cold pool. Further services: approx. 238 m of pipe insulation, 9 F-90 penetrations, 49 fire protection insulation sleeves, 56 core drillings, approx. 190 m of mounting rails, workshop and assembly planning, inspections, documentation, commissioning, acceptance with dye test for 4 pools, integrative tests, 2 weeks of trial operation, as-built documentation, and instruction. Work will be carried out in the existing building with partial ongoing operation of adjacent areas.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 792132-2026HTML
- TED PDF — 792132-2026PDF
- TED XML — 792132-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.