Balance of Plant (BoP) for KWK-138 DT-plant MVA Weisweiler
Planning, manufacturing, delivery, installation, assembly, commissioning, and trial operation of Balance of Plant (BoP) systems for the KWK-138 DT-plant MVA Weisweiler: This includes complete documentation in German, measurement, control, and regulation technology, steel construction, and connecting piping systems. The contractor acts as process owner and is responsible for the process and control integration of all new systems and plant components, including the coordination of interfaces and interaction with existing plants. The scope of supply includes fresh steam system, extraction steam system, condensate system, district heating system Aachen, district heating system Inden, intermediate cooling water system, drainage system, compressed air system, air condenser, absorption heat pump, deionate system, sampling station MH, district heating dosing station, water utilization system, natural gas system, feedwater pump cooling system, and drinking water system. Also included are connecting pipelines to adjacent lots and within the lot, standardized pipe supports (including primary and secondary steel construction), steel construction for platforms, walkways, railings, and ladders, valves, silencers, filters, measurements, and compensators, insulation, sound and corrosion protection, I&C and control technology, and spare and wear parts for 2 years of operation, further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 543911-2026HTML
- TED PDF — 543911-2026PDF
- TED XML — 543911-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.