Battery Storage System: Supply and Installation for Palatul Administrativ Maramureș
Supply, transport, handling, assembly, connection, configuration, commissioning, and integration of a system of 4 electrical energy storage batteries: Compatibility with existing Huawei SUN2000 -100KTL M2 inverters, including all necessary electrical, civil, grounding, monitoring, protection, and arrangement interventions for integrated operation with the existing photovoltaic system; obtaining approval from the distribution operator DEER SA. The contractor must obtain an agreement/approval for the technical solution and the exact placement of the battery systems from the general contractor (Asocierea S.C. EURAS S.R.L. - Lider de asociere – S.C. CONSTRUCȚII ERBAȘU S.A. – S.C. CUBICON INVEST S.R.L. – S.C. AVRIL S.R.L.) prior to implementation, due to ongoing total rehabilitation works of the administrative building (project „Reabilitare Palat Administrativ din județul Maramureș“, financing contract no. 136/30.09.2024, SMIS 302822, Regional Program Nord-Vest 2021-2027) with a current completion date of 01.11.2026.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 522439-2026HTML
- TED PDF — 522439-2026PDF
- TED XML — 522439-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.