Skip to main content
Activeted-518230-2026

Construction of a photovoltaic farm for public use in Katowice

Delivery of two photovoltaic installations, each with 0.995–0.999 MWp power, and associated energy storage systems, each with 1 MW power and 4 MWh capacity: design of PV farms and energy storage including electrical energy production analysis, obtaining all required administrative decisions and permits (including building permit and ornithological opinion after site inventory), installation and connection to the Tauron distribution network (including WP update), preparation of as-built documentation, configuration, commissioning, measurements, and instruction, carrying out actions to obtain the final operating permit. Additionally, common accompanying infrastructure must be built, consisting of: fencing with lighting infrastructure, video monitoring and intrusion detection system, access authorization system. The warranty and guarantee period is 60 months from the date of final acceptance. Detailed scope as per tender documents.

CONTRACTING AUTHORITY

Name

Miasto Katowice

City

Katowice

Country

PL

Website

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Supplies

Main CPV

09331200, Solar photovoltaic modules.

Other CPV

71320000, Engineering design services.

71323100, Electrical power systems design services.

09332000, Solar installation.

45310000, Electrical installation work.

31682540, Substation equipment.

31434000, Lithium accumulators.

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

11 days remaining

Similar Tenders

Explore CPV 09

Photovoltaic Systems with Construction Works for two buildings

Supply, installation, and commissioning of a photovoltaic system with associated construction works for the Youth Palace Katowice: design and approval of the photovoltaic system with all necessary components, modifications, and integration into the electrical installation; obtaining required permits and consents; obtaining legally required opinions, valid permits, inspections, agreements, and approvals of project documentation (especially with the contracting authority, fire protection, occupational safety and hygiene experts, and the competent conservator of monuments); author's supervision; supply of equipment and building materials; modification or replacement of the electrical installation to the necessary extent; creation of an automatically cooperating system of photovoltaic panels, inverters, reactive power compensation system, electrical installation, protection, and grounding; modification and adaptation of the lightning protection system; creation of necessary structures for PV modules; laying of cabling for connecting PV panels; installation of inverters for PV panels; installation of a smart meter device; supply and installation of a reactive power compensator for each connection; adaptation of the installation to applicable regulations (including fire safety switch); execution of tests and measurements of the entire installation; programming and commissioning of the control system; execution of the system startup; training of personnel designated by the contracting authority in the operation and safety of the photovoltaic system. All components of the photovoltaic system must possess the required certificates and approvals, and their compatibility (also with the central monitoring system of Katowice 'SMiS') must be ensured. Manufacturing, supply, and installation of an informational and commemorative plaque (80x40 cm). The photovoltaic modules are to be installed on the roof of the Pałac Młodzieży im prof. A. Kamińskiego building, ul. Mikołowska 26, with a total power of not less than 99.51 kWp and not more than 100 kWp. The investment is co-financed by European Funds for Silesia 2021-2027. The warranty and liability period for defects is 60 months from the date of final acceptance. further items as per the tender documents.

Miasto Katowice

·Katowice
Deadline:September 01, 2026

“Dostawa, montaż, uruchomienie oraz przekazanie do eksploatacji nowego, fabrycznie wyprodukowanego kotła wodnego o mocy 3 MW, przeznaczonego do spalania mieszaniny węgla kamiennego z biomasą lub gazu, wraz z kompletnym osprzętem, systemem automatyki sterującej, układem oczyszczania spalin oraz niezbędną infrastrukturą towarzyszącą w Ciepłowni Miejskiej w Bartoszycach przy ul. Bema 34”

Przedmiotem zamówienia jest: “Dostawa, montaż, uruchomienie oraz przekazanie do eksploatacji nowego, fabrycznie wyprodukowanego kotła wodnego o mocy 3 MW, przeznaczonego do spalania mieszaniny węgla kamiennego z biomasą lub gazu, wraz z kompletnym osprzętem, systemem automatyki sterującej, układem oczyszczania spalin oraz niezbędną infrastrukturą towarzyszącą w Ciepłowni Miejskiej w Bartoszycach przy ul. Bema 34.

Wodociągowo-Ciepłownicza Spółka z o.o. "COWIK" w Bartoszycach

·Bartoszyce
Deadline:August 26, 2026
€3M

Fourniture et livraison de carburants et de combustible (groupement de commande entre la Commune des Belleville et la Régie municipale des pistes)

Concerne la fourniture et la livraison en cuve de diesel, destiné au fonctionnement de divers engins routiers utilisés par la commune et le service des pistes

Commune Les Belleville

·Les Belleville
Deadline:September 03, 2026
PLN 346,676

Dostawa i montaż paneli fotowoltaicznych z magazynem energii – dostrzegalnie ppoż. Radnica, Kosobudki wraz z monitoringiem wizyjnym zabezpieczającym instalację fotowoltaiczną przed dewastacją

Przedmiotem zamówienia jest modernizacja dostrzegalni przeciwpożarowych, obejmująca dostawę wraz z montażem 2 instalacji fotowoltaicznych zasilających urządzenia na dostrzegalniach ppoż. wraz z infrastrukturą techniczną na terenie Nadleśnictwa Bytnica Zakres zamówienia obejmuje m.in.: - wykonanie zasilania fotowoltaicznego wraz z podtrzymaniem akumulatorowym dla wież ppoż. - montaż anten radioliniowych na wieżach ppoż. Pracujących w pasmie 5GHz do połączenia z siedzibą Nadleśnictwa Bytnica - montaż systemu antywłamaniowego wież ppoż. - montaż instalacji uziemiającej i wyrównawczej - montaż na terenie siedziby Nadleśnictwa Bytnica rejestratora obrazu kamer antywłamaniowych. Instalacje na wieżach ppoż. Będą zasilane z instalacji fotowoltaicznej wyposażonej w magazyn energii. Instalacje elektryczne na wieżach ppoż. Będą przystosowane do podłączenia agregatów prądotwórczych. niniejszego zamówienia.

Lasy Państwowe Nadleśnictwo Bytnica

·Bytnica
Deadline:September 14, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now