Construction of a Pedestrian and Cycle Path on a Former Sand Railway Line with Infrastructure and Street Furniture in Rybnik
Construction of a pedestrian and cycle path on the route of a former sand railway line: approx. 9.3 km long, connecting the Kłokocin district via ul. Żorska in Gotartowice to the Rybnik Paruszowiec railway stop via ul. Mikołowska, up to the cycle route between Wielopole and Kamień in Rybnik. The service includes a 4.0 m wide cycle path and a 1.8 m wide pedestrian path with asphalt surface, driveways connecting to other roads and intersecting routes, renovation of 3 bridge structures (steel bridge over the Ruda river, steel bridge over the railway line near Rybnik-Gotartowice, concrete viaduct in the Paruszowiec-Piaski forest), horizontal and vertical signage, energy-efficient LED lighting along the entire length with reactive power compensator, bicycle racks, e-bike charging stations, repair stations, and rest areas with shelters, skatepark, pumptrack, climbing walls, decorative boulders, recreational loungers, benches, and waste bins. Qualification requires proof of at least 2 construction works for roads/cycle paths, each valued at minimum 7,000,000.00 PLN gross, 1 construction work for bridge structures valued at minimum 1,500,000.00 PLN gross, and 2 construction works for railway infrastructure, each valued at minimum 2,000,000.00 PLN gross, all within the last 10 years. Required personnel include a construction manager with unlimited structural-building, road, electrical installation, and bridge construction licenses.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 564469-2026HTML
- TED PDF — 564469-2026PDF
- TED XML — 564469-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.