Construction of a Multi-Fuel Boiler EU II for Teplárna SEVER
Construction of a multi-fuel boiler as a Waste-to-Energy (WtE) plant at Teplárna SEVER in Třebíč: turnkey realization, including processing of 100% untreated municipal waste (large-volume waste to be shredded externally), preparation of execution documentation, delivery and assembly of all technological equipment and components, connection to existing infrastructure, ensuring trial operation, commissioning, performance of functional, operational, and guarantee tests, rectification of defects, resolution of non-compliance with guaranteed parameters, operator training, handover of complete operational, technical, and legally required documentation, warranty provision, site preparation and cleaning, performance of all necessary revisions, tests, and inspections, provision of required certificates and declarations of conformity.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 565220-2026HTML
- TED PDF — 565220-2026PDF
- TED XML — 565220-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.