Construction of a multi-fuel boiler for waste-to-energy in Třebíč
Construction of a multi-fuel boiler for waste-to-energy (WtE) at the Teplárna SEVER site in Třebíč: The boiler is designed for the combustion of 100% untreated municipal waste, with bulky waste being shredded outside the facility and delivered as processed material. The service includes a turnkey implementation, comprising the preparation of implementation documentation, delivery and assembly of all technological equipment and components, their installation and connection to the existing infrastructure, ensuring trial operation, commissioning, conducting functional, operational, and guarantee tests, rectification of defects, addressing non-compliance with guaranteed parameters, operator training, handover of complete operational, technical, and legally required documentation, and provision of warranty. Also included are site preparation and cleaning, carrying out all necessary revisions, tests, and inspections, and obtaining required certificates and declarations of conformity.
CONTRACTING AUTHORITY
Name
TTS energo s.r.o.
City
Třebíč, Borovina
Country
CZ
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Works
Main CPV
45222100, Waste-treatment plant construction work.
Other CPV
42320000, Waste incinerators.
71240000, Architectural, engineering and planning services.
ADDITIONAL DETAILS
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
31 days remaining(LOT-0001)
Published