Skip to main content
Activeted-482943-2026

Construction of a Road Interchange at DK81/DW944 Intersection in Skoczów

Construction of a road interchange at the existing intersection of National Road DK81 with Voivodeship Road DW944 (ul. Bielska) in Skoczów, including the removal of conflicts with non-road technical infrastructure. The scope of services includes roadworks: expansion of National Road DK81 (class GP2x2) from km 61+118 to km 62+424, expansion of Voivodeship Road DW944 (class G1x2) from km 9+270.98 to km 9+472.98, construction of a diamond-type road interchange at the intersection of DK81 with DW944 with grade-separated passage along DK81, construction of entrance and exit ramps, expansion of municipal road DG 430106S (ul. Potok, class D), expansion of municipal road DG 430056S (ul. Fabryczna, class D), reconstruction of municipal road DG 430074S (ul. Wiślańska, class L), construction of new municipal road sections, construction and reconstruction of sidewalks and pedestrian-bicycle paths, construction of a medium-sized roundabout at the junction of DW944 with the DK81 ramps, construction of a standard intersection of district road DP 2616S (ul. Stalmacha, class Z) with new municipal road no. 2 (section A, class L), construction of a standard intersection of new municipal road no. 2 (section A, class L) with new municipal road no. 2 (section B, class D), construction of a channelized intersection for right turns of ramp Ł2 of the interchange along DK81 (class GP) with municipal road no. 430056S (ul. Fabryczna, class D), equipped with deceleration and acceleration lanes, and reconstruction (demolition and construction) and construction of property access roads. Furthermore, the contract includes the construction of technical road equipment: drainage systems (surface drainage, road rainwater drainage system), street lighting system with power supply, facilities and devices for traffic participants (turning areas, pedestrian crossings, bicycle crossings), technical road devices (protective barriers, railings), tree and shrub removal as necessary, reconstruction (demolition and construction) and construction of fences. Bridge works include: construction of engineering structures (viaducts WD.1 along DK81 at km 61+777.35 over DW944 – left and right carriageway; bridge WD.2L along the left carriageway and ramp of DK81 at km 62+140.42 over the Bładnica River; bridge WD.2P along the right carriageway of National Road No. 81 at km 62+153.74 over the Bładnica River; bridge WD.3 along ramp Ł.2 of National Road No. 81 at km 62+170.54 over the Bładnica River; underpass PP.1 under DK81 at km 61+899.20; underpass PP.2 under DW944 at km 61+840.50; culvert P.1 in a ditch under DK81 at km 61+533.96; retaining structures KO.1 to KO.6) and demolition of conflicting engineering structures (bridges ID.1.L and ID.1.P along DK81 over the Bładnica River, bridge ID.2 along DG 430074S (ul. Wiślańska) over the Bładnica River, underpass under DK81, existing culvert ID.4 along National Road No. 81 at km 61+528.14). Environmental protection measures include the construction of acoustic barriers and the development of green spaces within the planned road right-of-way. Technical infrastructure within the road right-of-way not related to the road includes securing and reconstruction (demolition and construction) of power grids (low and medium voltage), telecommunication networks, water supply networks, gas networks (low, medium, and high pressure), and non-road rainwater drainage networks. The contract will be executed based on FIDIC Conditions of Contract for Construction and Engineering Works (Polish edition 2019, translation of the second English edition 2017 with errata 1 and 2). The estimated contract value is above 20,000,000.00 EUR. The contractor must personally perform key concrete works in bridge construction, excluding piling works, other specialized indirect foundation techniques, the production of structural prefabricates (concrete, steel, composite), finishing works, and material supplies and services. This requirement means the contractor cannot rely on the capacities of a third party for these specific key tasks to demonstrate compliance with participation conditions in the procedure. The estimated contract value is above 20,000,000.00 EUR. The contractor must personally perform key concrete works in bridge construction, excluding piling works, other specialized indirect foundation techniques, the production of structural prefabricates (concrete, steel, composite), finishing works, and material supplies and services. This requirement means the contractor cannot rely on the capacities of a third party for these specific key tasks to demonstrate compliance with participation conditions in the procedure.

CONTRACTING AUTHORITY

Name

Generalna Dyrekcja Dróg Krajowych i Autostrad

City

Katowice

Country

PL

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45000000, Construction work.

Other CPV

45221111, Road bridge construction work.

45221121, Road viaduct construction work.

45231000, Construction work for pipelines, communication and power lines.

45232130, Storm-water piping construction work.

45233120, Road construction works.

45233280, Erection of road-barriers.

45233290, Installation of road signs.

45316110, Installation of road lighting equipment.

45110000, Building demolition and wrecking work and earthmoving work.

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

39 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

39 days remaining

Similar Tenders

Explore CPV 45

Supply and Distribution of High-Methane Natural Gas for GDDKiA Warsaw

Supply and distribution of high-methane natural gas (Group E) for the General Directorate for National Roads and Motorways, Warsaw Branch.

Generalna Dyrekcja Dróg Krajowych i Autostrad

·Warszawa
Deadline:August 27, 2026

Legal advisory services for road projects on motorways A1, A2 and A4

Legal advisory services for road projects on motorways A1, A2 and A4: Ongoing support for the contracting authority in contractual relations with motorway concessionaires in the A1, A2, and A4 corridors, including preparing negotiation positions and participating in negotiations regarding changes to concession agreements; legal advice for the implementation of road investments; legal assessment of materials provided by the contracting authority and representatives of other entities designated by the contracting authority, including public administration bodies and external consultants, with particular consideration for limiting risks and threats to the contracting authority; participation in the drafting or evaluation of loan agreements, financial obligation security agreements, and settlement agreements in case of invalidity of direct agreements between the State Treasury, companies, and financing entities; legal advice for conducting contract negotiations and agreeing on the content of documents related to road projects; preparation of written legal opinions related to the implementation of road projects; legal advice for proceedings based on international agreements on the promotion and mutual protection of investments; preparation of draft amendments to agreements for the construction, construction and operation, or solely the operation of motorways; representation of GDDKiA before courts, state and local government administrative bodies, and other offices and institutions, including European and international institutions, in ongoing proceedings, provided this does not conflict with the provisions of the Act on the General Counsel to the Republic of Poland. The number of contracted working hours is 3,000, but not less than 160 hours. The lot is indivisible and must be executed by a single entity to ensure consistent processing of contractual documents and a unified policy towards all private partners.

Skarb Państwa - Generalna Dyrekcja Dróg Krajowych i Autostrad

·Warszawa
Deadline:August 03, 2026

Post-implementation analysis for the construction of the S1 expressway (formerly S69) section Przybędza – Milówka (Węgierska Górka bypass)

Post-implementation analysis of noise generated by the S1 expressway (formerly S69) section Przybędza – Milówka (Węgierska Górka bypass): comprises two stages. Stage I: execution of noise measurements, along with accompanying measurements, preparation of documentation titled 'Post-implementation analysis'. Stage II: acquisition and preparation of materials for the creation of a limited use area (including a copy of the cadastral map with marked boundaries of the limited use area), if necessary.

Generalna Dyrekcja Dróg Krajowych i Autostrad

·Katowice
Deadline:August 17, 2026

Supply of natural gas and gas distribution for the Generalna Dyrekcja Dróg Krajowych i Autostrad, Wrocław Branch and Regions

Supply of natural gas and gas distribution: for installations of the Generalna Dyrekcja Dróg Krajowych i Autostrad, Wrocław Branch and Regions, at the locations Bolesławiec (ul. Kościuszki 9), Piechowice (ul. Jeleniogórska 4), Wołów (ul. Piłsudskiego 10), Wrocław (ul. Korfantego 2/4), Lubań (ul. Kościuszki 26), Kąty Wrocławskie (ul. Drogowców 2), and Kłodzko (ul. Objazdowa 20).

Generalna Dyrekcja Dróg Krajowych i Autostrad

·Wrocław
Deadline:August 11, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now