Construction of Electric Vehicle and Aircraft Charging Points (400Hz) with Infrastructure in Design-Build
Construction of electric vehicle charging points and aircraft power supply points (400Hz) with associated infrastructure in a design-build formula: Development of complete design documentation based on OPZ, PFU, and the technical concept "Expansion of energy infrastructure to prepare electric vehicle charging points at Katowice Airport", including obtaining all legally required checks, agreements, opinions, permits, decisions, and a final building permit. The service also includes the transfer of proprietary copyrights to the developed design documentation, execution of construction works with obtaining an occupancy permit, and performing author's supervision during construction. Furthermore, it covers the delivery, installation, connection, commissioning, and handover of devices for operation according to OPZ, PFU, technical concept, and design documentation, conducting training on device operation, developing complete as-built documentation including any changes, and transferring proprietary copyrights to the as-built documentation to the Contracting Authority. The detailed scope is specified in attachments 2, 2.1a, and 2.1b of the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 547026-2026HTML
- TED PDF — 547026-2026PDF
- TED XML — 547026-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.