Construction Works for The South East Greenway – Lot 4
Construction works for 1.5 km of greenway in the Mountelliott townsland, north of New Ross, as part of the South East Greenway: Rehabilitation works to the Red Bridge, including removal of existing tracks and decking, specified repair works, installation of a new Greenway deck system, lighting, fencing, and guarding; earthworks to the existing embankment between the Red Bridge and Mount Elliott Lane; rehabilitation works within Mount Elliott Tunnel; construction of a new bridge structure spanning Mount Elliott Lane with piled foundation supports; construction of ramped access to the North of the Mount Elliott tunnel from the Greenway corridor to the R700; construction of the Greenway Lot 4 Section pavement in accordance with Works Requirements, along with all ancillary works including site clearance, landscaping, finishes, fixtures and fittings, drainage, fencing, lighting, adjacent landowner accommodation works, and all public pedestrian and cyclist infrastructure.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 602881-2026HTML
- TED PDF — 602881-2026PDF
- TED XML — 602881-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.