Temporary Bypass and Demolition of Existing Structure for A565/A61
Construction work for a temporary bypass and the demolition of an existing structure: approx. 3,910 m² excavation shoring (sheet piling), approx. 575 m³ excavation, approx. 9,500 m³ earth material for ramps (delivery and installation), including material for backfilling, approx. 80.5 m temporary bridge (provided by the client), approx. 318 t steel transport for temporary bridge SS80 (bridge components), approx. 155 t steel transport for temporary bridge SS80 (launching nose), approx. 26 t steel transport for temporary bridge SS80 (roller batteries), approx. 150 m³ in-situ reinforced concrete, approx. 215 m² formwork, approx. 25 t reinforcing steel, approx. 1,250 m³ demolition and dismantling of concrete, approx. 6,200 m³ earthworks including road surface breaking, approx. 150 m installation of DN 300 pipelines, approx. 850 m³ frost protection layer 0/32, approx. 1,640 m² asphalt base course made of AC 22 T S, approx. 1,600 m² asphalt binder course made of SMA 16 B S, approx. 1,600 m² asphalt wearing course made of SMA 8 S, approx. 1,240 m dismantling of safety barriers, approx. 1,122 m installation of safety barriers, approx. 6 units dismantling of transition constructions, approx. 13 units installation of transition constructions, approx. 2 units dismantling of crash attenuators, and approx. 2 units installation of crash attenuators.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
45221110, Bridge construction work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
30 days remaining(LOT-0000)
Published