Skip to main content
Activebkms-ef-25611696-1

Removal of woody vegetation for motorway junction KR Süd

Removal of woody vegetation: Framework agreement for on-call assignments at the motorway junction KR Süd.

CONTRACTING AUTHORITY

Name

Die Autobahn GmbH des Bundes - NL Rheinland

City

Niederlassung Rheinland

Country

DE

CLASSIFICATION

Procedure Type

de-open

Contract Type

Works

Main CPV

45000000, Construction work.

ADDITIONAL DETAILS

Legal Basis

de-vob

DEADLINES & TIMELINE

Submission Deadline

25 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

25 days remaining

Similar Tenders

Explore CPV 45

Planning Services for Traffic Facility and Engineering Structure/Structural Design A 59

Planning services for the 6-lane expansion of the A 59 in the section AD Sankt Augustin-West (A 560) to T+R Liburer Heide (A 559), construction km 18+069 to construction km 23+593, within the municipal areas of Troisdorf and Sankt Augustin: Investigation and evaluation of all technically and planning-wise feasible solutions for the structural and traffic situation, based on a traffic study with a forecast horizon of 2035. This includes service phases 1-4 for traffic facilities and service phases 1-3 for engineering structures/structural design. The planning aims to minimize safety risks and ensure performance and traffic safety through adjustments at interchanges, an efficient cross-section, proper median design, and adequate drainage. Specific challenges include conflicts with high-voltage power lines, gas pipelines, crossing traffic routes and rivers, and dense development. Variant evaluation considers traffic quality, traffic safety, construction process/technical feasibility, noise protection, costs/economic efficiency, urban integration, and environmental compatibility. A major complex issue is the Siegbrücke bridge, requiring an 8-lane new construction in an FFH area and complex temporary traffic management. Additionally, the planning of an entry lane between AD Sankt Augustin-West and AS Troisdorf in the direction of Cologne is included. Project execution will be model-based using the BIM method, with data delivery in OKSTRA format 2.022 or newer; further items as per the tender documents.

Die Autobahn GmbH des Bundes - NL Rheinland

·Krefeld
Deadline:August 25, 2026

Geotechnical Investigations for the A46 near Wuppertal-Barmen

Geotechnical investigations for the A46 near Wuppertal-Barmen: 97 pieces of core drillings.

Die Autobahn GmbH des Bundes - NL Rheinland

·Krefeld
Deadline:August 21, 2026

Traffic Safety Measures for Geotechnical Investigations on the A46

Traffic safety measures for geotechnical investigations on the A46, Barmen interchange in Wuppertal: long-term and short-term measures as part of a maintenance design.

Die Autobahn GmbH des Bundes - NL Rheinland

·4283 Wuppetal, Nuts-Code DEA1A
Deadline:August 21, 2026

Exploration and Investigation Works for A59 Temporary Bypass

Exploration and investigation works for the A59 temporary bypass: execution of exploration boreholes, cased boreholes for continuous core soil samples, borehole dynamic probing (BDP), dynamic core penetration tests/small boreholes, dynamic probing with heavy dynamic penetrometer (DPH), sampling for geotechnical laboratory tests, and unexploded ordnance (UXO) detection.

Die Autobahn GmbH des Bundes - NL Rheinland

·Bonn NUTS-Code: DEA22
Deadline:August 19, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now