Concrete Renovation for Rhinoceros Enclosure
Concrete renovation for the rhinoceros enclosure, divided into two construction phases: 1st construction phase 2026 (interior) includes 600 m² hot water high-pressure cleaning, 140 m² sandblasting, 40 crack closures, 6 m joint renovation, 140 repairs of damaged areas, 240 m² hydrophobing, 150 m² scratch plastering, and 30 hours of door widening modification. 2nd construction phase 2027 (exterior) includes 240 m² hot water high-pressure cleaning, 85 m² sandblasting, 40 crack closures, 14 m joint renovation, 110 repairs of damaged areas, 155 m² hydrophobing, and 85 m² scratch plastering.