Biomass Boiler K2 for KEC Energy Center
Biomass Boiler K2: Construction, delivery, and commissioning of a new biomass boiler K2 with a thermal output of 2-2.4 MWt at the KEC energy center in Kožichovice-Třebíč. The scope includes the project design, supply, manufacturing, assembly, and commissioning of the boiler, including fuel storage, ash handling, flue gas cleaning, connection to existing distribution and control systems, and the building shell for the new K2 operation. The design must consider connection to district heating (CZT) and coordination with the cogeneration center, biomass boiler K1, and heat pumps. Construction services also include a K2 switchgear, which will be located outside the building but structurally separated from the operating area for protection against dust, temperatures, and operational hygiene.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 571859-2026HTML
- TED PDF — 571859-2026PDF
- TED XML — 571859-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.